[{"data":1,"prerenderedAt":19},["ShallowReactive",2],{"news-detail-2735-zh":3},{"id":4,"userId":5,"userName":6,"title":7,"enTitle":8,"content":9,"enContent":10,"date":11,"files":12,"carrierCode":17,"createdDate":18},2735,1031692,"王奕翔","荷兰内河航运低水位附加费（LWS）介绍","Introduction of Low Water Surcharge (LWS) for Inland Waterway Transportation in the Netherlands","\u003Cp>由于荷兰多条内陆水道水位持续下降，马士基正在更新其往返荷兰部分内陆码头的内陆驳船运输低水位附加费（LWS）。\u003C/p>\u003Cp>这笔附加费将有助于解决与这些特殊情况相关的额外成本。\u003C/p>\u003Cp>生效日期 2026年10月13日\u003C/p>\u003Cp>自2026年10月6日起，内陆运输将征收附加费，该附加费将持续有效，直至水位恢复至正常运行状态。\u003C/p>\u003Cp>适用标准：\u003C/p>\u003Cp>附加费将根据以下指定测量点的水位触发：\u003C/p>\u003Cp>\u003Cimg src=\"https://geekfiles.oss-cn-shanghai.aliyuncs.com/rms/52c3582c5942480a808393dfb5bf10fa.png\">\u003C/p>\u003Cp>附加信息：\u003C/p>\u003Cp>低水位状况会降低内河驳船的承载能力，并增加整个供应链的运营成本。此项附加费旨在部分抵消这些额外成本，同时确保持续的服务可靠性。\u003C/p>\u003Cp>低水位情况属于特殊且不可预见的情形，超出我们的控制范围，既无法预判其严重程度，也无法预测其持续时间。我们将尽最大努力在整个过程中高效管理货物流转。\u003C/p>\u003Cp>感谢您的理解与支持。\u003C/p>\u003Cp>如有任何疑问，请联系您当地的马士基代表，或访问我们的网站获取最新动态。\u003C/p>\u003Cp>感谢您一直以来的支持与理解。\u003C/p>\u003Cp>\u003Cbr>\u003C/p>","\u003Cp>Due to the continued decline in water levels across several Dutch inland waterways, Maersk is updating its Low Water Surcharge (LWS) for inland barge transportation to and from selected inland terminals in the Netherlands.&nbsp;\u003C/p>\u003Cp>Recent drought conditions have led to increasing operational constraints on the inland waterway network, including navigation restrictions and the&nbsp;\u003Ca href=\"https://www.maersk.com/news/articles/2026/08/07/twentekanaal-contingency-surcharge-hengelo-almelo\" rel=\"noopener noreferrer\" target=\"_blank\" style=\"color: rgb(0, 115, 171);\">Temporary closure of the Twentekanaal\u003C/a>, further impacting the efficiency and reliability of inland transportation services.&nbsp;\u003C/p>\u003Cp>The surcharge will help address the additional costs associated with these extraordinary circumstances.&nbsp;\u003C/p>\u003Cp>Effective Date 13 Oct 2026\u003C/p>\u003Cp>The surcharge will be applicable for inland movements performed from 6 October 2026 onwards and will remain in effect until water levels have returned to normal operating conditions.&nbsp;\u003C/p>\u003Cp>Application Criteria:&nbsp;\u003C/p>\u003Cp>The surcharge will be triggered based on water levels at the designated measurement points listed below:\u003C/p>\u003Cp>\u003Cimg src=\"https://geekfiles.oss-cn-shanghai.aliyuncs.com/rms/80906ffc090b48fc886c74f59320f15b.png\">\u003C/p>\u003Cp>Additional Information:&nbsp;\u003C/p>\u003Cp>Low water conditions reduce the carrying capacity of inland barges and increase operational costs throughout the supply chain. This surcharge is intended to partially offset these extraordinary costs and ensure continued service reliability.&nbsp;\u003C/p>\u003Cp>The low water situation is an exceptional and unforeseeable situation that is beyond our control and cannot be predicted, neither severity nor duration. We will do our utmost to manage the cargo flows efficiently throughout.&nbsp;\u003C/p>\u003Cp>We appreciate your understanding and support.&nbsp;\u003C/p>\u003Cp>Should you have any questions, please contact your local Maersk representative or visit our website for the latest updates.&nbsp;\u003C/p>\u003Cp>Thank you for your continued support and understanding.\u003C/p>\u003Cp>\u003Cbr>\u003C/p>","2026-10-14",[13],{"fileUrl":14,"fileName":15,"fileId":16},"https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/46261673f5044be5a7526570283702c1.jpeg","46261673f5044be5a7526570283702c1.jpeg",7531545,"MAERSK",1791943982000,1792466837312]