[{"data":1,"prerenderedAt":48},["ShallowReactive",2],{"news-detail-2430-zh":3,"news-recent-2430-zh":19},{"id":4,"userId":5,"userName":6,"title":7,"enTitle":8,"content":9,"enContent":10,"date":11,"files":12,"carrierCode":17,"createdDate":18},2430,1031692,"王奕翔","北美东海岸及西海岸（M3W 与 M4W）至印度南部、孟加拉国及斯里兰卡地区超重附加费（HWS）实施","Heavy Load Surcharge (HWS) Implementation South India, Bangladesh & Sri Lanka Area to North America East Coast & West Coast (M3W & M4W)","\u003Ch1>\u003Cbr>\u003C/h1>\u003Cp>马士基将对从印度北部、巴基斯坦及中东地区发往北美的20英尺干货集装箱（干货箱及罐式箱）实施超重附加费（HWS），适用条件为集装箱经核实的总重量（VGM）超过19公吨。该费用的价格计算生效日期为2026年7月9日。\u003C/p>\u003Cp>新的费率标准如下：\u003C/p>\u003Cp>\u003Cimg src=\"https://geekfiles.oss-cn-shanghai.aliyuncs.com/rms/1904561ea4de45a98293bd362d674150.png\">\u003C/p>\u003Cp>当经核实的总质量（VGM）超过重量阈值时，将触发重载附加费。经核实的总质量（VGM）指的是货物重量（包括衬垫和支撑材料）加上承载该货物的集装箱皮重。\u003C/p>\u003Cp>对于非散货船业务，对于非现货预订，PCD 指预订确认时第一航段水运输的计划开航日期。\u003C/p>\u003Cp>对于联邦海事委员会（FMC）而言，非现货订舱的提箱截关日期为最后一个集装箱进场日期。\u003C/p>\u003Cp>供您参考，您可随时在我们的运价查询页面直接查看最新的运价等级和费率结构：https://www.maersk.com/tariff-lookup/（当前覆盖范围：受美国联邦海事委员会（FMC）和欧洲经济区（EEA）监管的国家）\u003C/p>\u003Cp>对于受《美国航运法》或《中国海事条例》约束的货运业务，除非已在已向美国联邦海事委员会（FMC）或上海航运交易所（视情况而定）备案的服务合同或服务合同修订书中载明，否则与马士基运价不同的报价或附加费对马士基不具有约束力。\u003C/p>\u003Cp>我们会定期审核所有附加费，你可以在\u003Ca href=\"https://www.maersk.com/news/category/rate-announcements\" rel=\"noopener noreferrer\" target=\"_blank\" style=\"color: rgb(0, 115, 171);\">此处\u003C/a>查看所有附加费的最新信息。\u003C/p>\u003Cp>如果您还有其他问题，请联系\u003Ca href=\"https://www.maersk.com/contact\" rel=\"noopener noreferrer\" target=\"_blank\" style=\"color: rgb(0, 115, 171);\">您当地的马士基代表\u003C/a>。我们随时待命，协助您规划未来的供应链运输，并满足您的物流需求。\u003C/p>","\u003Ch1>\u003Cbr>\u003C/h1>\u003Cp>Maersk is implementing the Heavy Load Surcharge (HWS) for 20’ dry containers (DC &amp; TANK) with Verified Gross Mass (VGM) exceeding 19 metric tons from North India, Pakistan &amp; Middle East Area to North America. Effective price calculation date 9 July 2026.\u003C/p>\u003Cp>The new tariff levels are as follows:\u003C/p>\u003Cp>\u003Cimg src=\"https://geekfiles.oss-cn-shanghai.aliyuncs.com/rms/3f0985ddab0048cc8f381cc768cf0bbe.png\">\u003C/p>\u003Cp>When Verified Gross Mass (VGM) exceeds the weight threshold, Heavy Load Surcharge will be triggered. The Verified Gross Mass (VGM) is the weight of the cargo including dunnage and bracing plus the tare weight of the container carrying this cargo.\u003C/p>\u003Cp>Heavy Weight Surcharge will be applicable to all Ocean products excluding SPOT and Maersk Go.\u003C/p>\u003Cp>For non-FMC, PCD refers to the scheduled departure date of the first water leg at the time of booking confirmation for non-spot bookings.\u003C/p>\u003Cp>For FMC, PCD is last container gate-in date for non-spot bookings.\u003C/p>\u003Cp>For your reference, you can always view the latest levels and rate structures directly on our Tariff Lookup page: https://www.maersk.com/tariff-lookup/ (Current coverage: FMC – Federal Maritime Commission and EEA – European Economic Area regulated countries)\u003C/p>\u003Cp>For trades subject to the US Shipping Act or the China Maritime Regulations, quotations or surcharges that vary from the Maersk tariff shall not be binding on Maersk unless included in a service contract or service contract amendment that has been filed with the Federal Maritime Commission (FMC) or the Shanghai Shipping Exchange, as applicable.\u003C/p>\u003Cp>We review all surcharges regularly and you can find all surcharge updates&nbsp;\u003Ca href=\"https://www.maersk.com/news/category/rate-announcements\" rel=\"noopener noreferrer\" target=\"_blank\" style=\"color: rgb(0, 115, 171);\">here\u003C/a>.\u003C/p>\u003Cp>If you have any further questions, please contact&nbsp;\u003Ca href=\"https://www.maersk.com/contact\" rel=\"noopener noreferrer\" target=\"_blank\" style=\"color: rgb(0, 115, 171);\">your local Maersk representative\u003C/a>. We are always standing by to help you plan your future supply chain moves and assist you with your logistical needs.\u003C/p>","2026-06-08",[13],{"fileUrl":14,"fileName":15,"fileId":16},"https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/0c6ab27a14764380be87865e07037301.jpeg","0c6ab27a14764380be87865e07037301.jpeg",6547701,"MAERSK",1780969503000,[20,26,32,37,42],{"id":21,"date":22,"title":23,"summary":24,"image":25},2440,"2026-06-11","从印度次大陆和巴基斯坦运往欧洲的货运？已有价格公告","将会上调。此次上调的有效期适用于2026年7月6日起的航次。 以下是此次涨价的具体详情： 20英尺干货集装箱——所有价格均以美元计价 适用于40英尺干货集装箱——所有价格均以美元计价 请注意，本海运运价需遵守以下条款及附加费： 有效期：另行…","https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/86ad9e0be3bf45f7bfa7afd4c23e6652.jpeg",{"id":27,"date":28,"title":29,"summary":30,"image":31},2439,"2026-06-10","远东至北欧及地中海（东行/西行）旺季附加费（PSS）的实施","马士基调整远东亚洲（不含韩国）至北欧和地中海航线的旺季附加费（PSS），价格计算生效日期为2026年7月1日。韩国出发的货物价格计算生效日期为2026年7月10日。 运费金额明细如下： *目的地指贸易范围内的目的地，可能与全球地理定义不同。…","https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/c0c49c4e0f6140f194ea2e9936079563.jpeg",{"id":33,"date":22,"title":34,"summary":35,"image":36},2438,"变更至印度次大陆至北欧及地中海地区应急应急附加费（E3W 与 E4W）","我们特此通知您，印度次大陆至北欧及地中海航线（E3W 与 E4W 航线）的应急应急附加费（ECS）将有所调整。 以下航线的费用将发生调整： 印度次大陆至北欧 印度次大陆至地中海 附加费的上调将自2026年6月24日的价格计算日（PCD）起生…","https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/a64a8356c98d4861bbde238b98ee9116.png",{"id":38,"date":28,"title":39,"summary":40,"image":41},2437,"港口附加费/港口规费出口（PAE）/ 港口附加费/港口规费进口（PAI）—— 适用范围：南非往返全球","马士基特此通知客户，根据5月14日公布的码头费用上调通知，出口港口附加费/港口费（PAE）和进口港口附加费/港口费（PAI）将相应上调。此次费用调整旨在弥补南非Transnet港口码头公司（TPT）新征收的燃油中立费。 燃油中性费将适用于所…","https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/84c836201e114427a97c5d8265ae6045.jpeg",{"id":43,"date":44,"title":45,"summary":46,"image":47},2436,"2026-06-09","卡萨布兰卡铁路枢纽（MAASE）进口内陆旺季附加费终止通知","我们特此通知您，关于我司发往卡萨布兰卡铁路枢纽（MAASE）的内陆物流服务，有一项重要更新事宜。 我们很高兴地通知您，自2026年6月10日起，随着情况恢复正常，旺季一阶段的进口货物附加费将取消。 附加费详情： 名称：进口内陆旺季附加费（I…","https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/2a76e7e8b72d4c56a27faecfaaee8fc5.jpeg",1781186874017]