[{"data":1,"prerenderedAt":48},["ShallowReactive",2],{"news-detail-2339-en":3,"news-recent-2339-en":19},{"id":4,"userId":5,"userName":6,"title":7,"enTitle":8,"content":9,"enContent":10,"date":11,"files":12,"carrierCode":17,"createdDate":18},2339,1031692,"王奕翔","实施重载附加费（HWS）——中国至巴西、阿根廷及乌拉圭（X4FS）","Implementation of Heavy Load Surcharge (HWS) – China to Brazil, Argentina, and Uruguay (X4FS)","\u003Ch1>\u003Cbr>\u003C/h1>\u003Cp>\u003Cbr>\u003C/p>\u003Cp>马士基将对从东亚至巴西、阿根廷和乌拉圭航线的货物征收超重附加费，具体为：20种经核实总重量（VGM）超过20公吨的20英尺干货箱类型，以及40种经核实总重量（VGM）超过23公吨的40英尺非运行冷藏箱。该费用自2026年5月29日起生效，作为价格计算基准日。\u003C/p>\u003Cp>费率标准如下：\u003C/p>\u003Cp>\u003Cimg src=\"https://geekfiles.oss-cn-shanghai.aliyuncs.com/rms/8cb418f2ce664dffaeaeab89a192e96d.png\">\u003C/p>\u003Cp>本次实施中的20种干货运设备类型包括20英尺干货箱、20英尺散货箱、20英尺可折叠平板箱、20英尺平板箱、20英尺蜂巢箱、20英尺宽托盘箱、20英尺开顶箱、20英尺罐式箱和20英尺双层箱。\u003C/p>\u003Cp>当经核实的总质量（VGM）超过重量阈值时，将触发重载附加费。经核实的总质量（VGM）指的是货物重量（包括衬垫和支撑材料）加上承载该货物的集装箱皮重。\u003C/p>\u003Cp>超重附加费将适用于所有海运产品，包括合同产品、现货订舱、马士基直达产品及其他产品。\u003C/p>\u003Cp>对于现货订舱，上述费率是根据订舱确认日期调取的。\u003C/p>\u003Cp>（当前覆盖范围：联邦海事委员会（FMC）和欧洲经济区（EEA）监管国家）\u003C/p>\u003Cp>对于受《美国航运法》或《中国海事条例》约束的运输业务，除非已纳入已向美国联邦海事委员会（FMC）或上海航运交易所（视情况而定）备案的服务合同或服务合同修订件中，否则与马士基运价不同的报价或附加费对马士基不具有约束力。\u003C/p>\u003Cp>我们会定期审核所有附加费，你可以在\u003Ca href=\"https://www.maersk.com/news/category/rate-announcements\" rel=\"noopener noreferrer\" target=\"_blank\" style=\"color: rgb(0, 115, 171);\">此处\u003C/a>查看所有附加费的更新信息。\u003C/p>\u003Cp>如果您还有任何进一步的问题，请联系\u003Ca href=\"https://www.maersk.com/contact\" rel=\"noopener noreferrer\" target=\"_blank\" style=\"color: rgb(0, 115, 171);\">您当地的马士基代表\u003C/a>。我们随时待命，协助您规划未来的供应链运输，并满足您的物流需求。\u003C/p>","\u003Ch1>\u003Cbr>\u003C/h1>\u003Cp>Maersk is implementing the Heavy Load Surcharge Heavy Load Surcharge for 20 all dry equipment types with Verified Gross Mass (VGM) exceeding 20 metric tons and 40 non-operating reefer with Verified Gross Mass (VGM) exceeding 23 metric tons from Far East Asia to Brazil, Argentina, and Uruguay, effective price calculation date 29th May 2026.&nbsp;\u003C/p>\u003Cp>The tariff levels are as follows:&nbsp;\u003C/p>\u003Cp>\u003Cimg src=\"https://geekfiles.oss-cn-shanghai.aliyuncs.com/rms/861bb56c6d834bbba3f13e60b76b0f28.png\">\u003C/p>\u003Cp>20 dry equipment types in this implementation include 20’Dry, 20’Bulk, 20’Collapsible Flat rack, 20’ Flat rack, 20’ Hive, 20’ Pallet Wide, 20’ Open top, 20’ Tank, and 20’ Twin Deck.&nbsp;\u003C/p>\u003Cp>When Verified Gross Mass (VGM) exceeds the weight threshold, Heavy Load Surcharge will be triggered. The Verified Gross Mass (VGM) is the weight of the cargo including dunnage and bracing plus the tare weight of the container carrying this cargo.&nbsp;\u003C/p>\u003Cp>Heavy Load Surcharge will be applicable to all Ocean products including contract products, SPOT, Maersk Go, and others.\u003C/p>\u003Cp>For non-FMC, PCD refers to the scheduled departure date of the first water leg at the time of booking confirmation for non-spot bookings.\u003C/p>\u003Cp>For FMC, PCD is last container gate-in date for non-spot bookings.\u003C/p>\u003Cp>For SPOT booking, the above rate is retrieved based on booking confirmation date.\u003C/p>\u003Cp>For your reference, you can always view the latest levels and rate structures directly on our Tariff Lookup page: https://www.maersk.com/tariff-lookup/\u003C/p>\u003Cp>(Current coverage: FMC – Federal Maritime Commission and EEA – European Economic Area regulated countries)\u003C/p>\u003Cp>For trades subject to the US Shipping Act or the China Maritime Regulations, quotations or surcharges that vary from the Maersk tariff shall not be binding on Maersk unless included in a service contract or service contract amendment that has been filed with the Federal Maritime Commission (FMC) or the Shanghai Shipping Exchange, as applicable.\u003C/p>\u003Cp>We review all surcharges regularly and you can find all surcharge updates&nbsp;\u003Ca href=\"https://www.maersk.com/news/category/rate-announcements\" rel=\"noopener noreferrer\" target=\"_blank\" style=\"color: rgb(0, 115, 171);\">here\u003C/a>.&nbsp;\u003C/p>\u003Cp>If you have any further questions, please contact&nbsp;\u003Ca href=\"https://www.maersk.com/contact\" rel=\"noopener noreferrer\" target=\"_blank\" style=\"color: rgb(0, 115, 171);\">your local Maersk representative\u003C/a>. We are always standing by to help you plan your future supply chain moves and assist you with your logistical needs.\u003C/p>","2026-05-13",[13],{"fileUrl":14,"fileName":15,"fileId":16},"https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/b60e633472494c018e7c23bcef560b2c.jpg","b60e633472494c018e7c23bcef560b2c.jpg",6363306,"MAERSK",1778723062000,[20,26,32,37,42],{"id":21,"date":22,"title":23,"summary":24,"image":25},2440,"2026-06-11","Shipping from Indian Subcontinent and Pakistan to Europe? A price announcement is available","Our ocean tariff rates from Indian Subcontinent and Pakistan to North Europe and Mediterranean Sea will increase. The va…","https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/86ad9e0be3bf45f7bfa7afd4c23e6652.jpeg",{"id":27,"date":28,"title":29,"summary":30,"image":31},2439,"2026-06-10","Implementation of Peak Season Surcharge (PSS) from Far East Asia to North Europe and Mediterranean (E1W/E2W)","Maersk is revising the Peak Season Surcharge (PSS) for the scope of Far East Asia (Excluding Korea, South) to North Euro…","https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/c0c49c4e0f6140f194ea2e9936079563.jpeg",{"id":33,"date":22,"title":34,"summary":35,"image":36},2438,"Change to Emergency Contingency Surcharge Indian Subcontinent to North Europe & Mediterranean (E3W & E4W)","We would like to inform you of changes to the Emergency Contingency Surcharges (ECS) for Indian Subcontinent to North Eu…","https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/a64a8356c98d4861bbde238b98ee9116.png",{"id":38,"date":28,"title":39,"summary":40,"image":41},2437,"Port Additional / Port Dues Export (PAE)/ Port Additionals/ Port Dues Import (PAI)– for the scope: South Africa to/from World ","Maersk would like to inform customers of the increase of the Port Additional / Port Dues Export (PAE) and Port Additiona…","https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/84c836201e114427a97c5d8265ae6045.jpeg",{"id":43,"date":44,"title":45,"summary":46,"image":47},2436,"2026-06-09","Termination of Inland Peak Season Surcharge Import at Casablanca Rail terminal (MAASE)","We want to inform you of an important update regarding your inland logistics services with our company towards Casablanc…","https://geekfiles.oss-cn-shanghai.aliyuncs.com/crm/2a76e7e8b72d4c56a27faecfaaee8fc5.jpeg",1781186888803]